WireWicket / Field calculation 02

Raceway fill batch schedule

Calculate multiple raceway-fill cases, then import a CSV or XLSX feeder schedule to review row-level fill limits, voltage-drop advisories, and supported ampacity overloads. Valid imports stay with their source row and can be exported together as a paginated PDF.

Reference annotations use NFPA 70 (NEC) 2026, Chapter 9 Tables 1, 4, and 5, and the selected raceway’s Article. Verify the edition adopted in your jurisdiction and any local amendments before relying on a calculation.

Loading member import access…

Editable schedule

Compare each run.

Set a conductor count, conductor size, raceway, and compatible trade size in each row. Valid cases calculate as you edit; an incomplete row leaves its neighbors intact.

3 rows · 0 calculated · 0 need correction

Batch results

Inputs and references, side by side.

On narrow screens, scroll within the schedule to reach every column.

RowConductorsConductor sizeRacewayTrade sizeTotal areaAllowable areaActual fillLimitNEC referencesActions
1—————
2—————
3—————