WireWicket / Field calculation 02
Raceway fill batch schedule
Check a group of conductor and raceway combinations at once. Every row is calculated on its own, so one correction never hides results from the rest of the schedule.
Paste schedule rows
One line per check.
Use this order: conductor count, conductor size, raceway type, trade size. Paste spreadsheet tabs or comma-separated values. A header row is optional.
Example: 6, 12 AWG, EMT, 3/4
Raceway names: EMT, RMC, PVC Schedule 40, PVC Schedule 80
Paste rows to calculate each line as you edit.
Batch results
Review every source line.
Scroll the table horizontally on narrow screens.
| Line | Conductors | Conductor size | Raceway | Trade size | Total area | Allowable area | Actual fill | Status / correction |
|---|---|---|---|---|---|---|---|---|
| Your row results will appear here. | ||||||||