Raceway fill
35.3%
40% limit · 0.7176 in² of 2.0360 in²
Within selected limit
- 3 × Phase conductors0.6669 in²
- 1 × Equipment grounding conductor (6 AWG)0.0507 in²
WireWicket / Permit Package — in development
A project workspace for electrical calculations and material planning.
Available now: Live standalone calculators, project circuit records, supported check handoffs, material quantities, and known-price totals. The interactive sample submittal is clearly a sample.
In development: Full code-compliance circuit sizing, plan recognition, labor, bid/profit, and a full contractor-ready package.
For US electrical contractors, estimators & engineers
Interactive submittal preview
Applied to the verified AC calculation when PVC is selected. EMT uses a resistance-only screening estimate; this input is not applied there.
Demo assumptions: copper THHN / THWN-2, 90°C ampacity starting column, 86°F base ambient, three current-carrying phases, and no neutral. The 200 A overcurrent-device rating is an illustrative default; confirm it for the actual circuit.
The Table 250.122 base copper EGC is calculated from this rating. No manual EGC size is assumed.
Live output
Three-phase values recalculate as you edit.
Raceway fill
35.3%
40% limit · 0.7176 in² of 2.0360 in²
Within selected limit
Equipment grounding conductor
6 AWG copper
200 A device · Table 250.122 base 6 AWG
Three-phase voltage drop
5.88 V
1.22% of 480 V line-to-line · Resistance-only screening estimate
Derated ampacity
195 A
195 A base × 1.00 ambient × 1.00 conductor factor
Circuit basis
480Y/277V
3 current-carrying conductors · 4 conductors counted for fill
Voltage basis: Resistance-only, unity-power-factor screening estimate using K = 12.9 at 75°C. It does not include inductive reactance, apply the entered power factor, or model EMT/RMC impedance. Use an installation-specific AC impedance calculation for design review. NCCER Electrical Formula Sheet
Ampacity basis: 90°C is the starting column only; its source row is cross-checked to Southwire Installation Guide, NEC Table 310.15(B)(16) (formerly 310.16), reprinted 2017. The 75°C Table 310.16 value for this conductor is 175 A. Terminal, load, and other NEC limits are not evaluated here. NEC Table 310.16 NFPA 2026 code-cycle table Southwire table cross-check
Phase and EGC sizing: This is a modeled minimum using the available copper 90°C starting-column rows and supported correction factors. It is not a final verified conductor selection; check 75°C terminal limits, load rules, and installation conditions. NEC 250.122(A) and 250.122(B)
Fill references: Chapter 9, Table 1 (permitted fill); Table 4 (EMT raceway area); Table 5 (THHN / THWN-2 conductor area). Article 358 (EMT). View NFPA 70 (2026) in NFPA LiNK
Restoring this tab’s saved example inputs…
01 / Calculation desk
Keep useful code context close to the inputs, so a calculation is easier to review and easier to pass along.
Check conductor fill across common raceways, with NEC Chapter 9 references alongside the calculation.
Edit a group of conductor and raceway rows, then review each valid result and correction in place.
Bring ambient-temperature and current-carrying conductor adjustments into the same review.
Estimate single- or three-phase voltage drop using verified resistance and reactance data where available.
Add NEC 314.16 fill allowances, check box capacity, and size 4 AWG-and-larger pull boxes.
Use supported NEC motor table rows for full-load current, conductors, branch protection, overloads, and the equipment grounding conductor.
Calculate winding current, transformer overcurrent limits, and copper conductor and ground sizes with a direct raceway-fill handoff.
Get a quick, cited answer for supported code questions, then adjust the inputs in a live raceway-fill calculator.
02 / From run to record
Separate calculators are easy to find. A consistent project record and a clean handoff are what help teams stay in sync.
Create or open a project and keep the circuit inputs, material basis, and route assumptions together.
See supported advisory outputs and explicit unsupported or not-assessed states without a compliance claim.
Reuse the saved circuit to generate quantities and a known-price material subtotal, with unpriced lines called out.
Reference note
WireWicket helps organize calculation inputs and NEC references. Verify every reference and result against the NEC edition adopted for the job and the project’s requirements.