WireWicket / Permit Package — in development

Design once, then review supported checks and build a material cost rollup.

A project workspace for electrical calculations and material planning.

Available now: Live standalone calculators, project circuit records, supported check handoffs, material quantities, and known-price totals. The interactive sample submittal is clearly a sample.

In development: Full code-compliance circuit sizing, plan recognition, labor, bid/profit, and a full contractor-ready package.

For US electrical contractors, estimators & engineers

Interactive submittal preview

Adjust the circuit. See the handoff.

SAMPLE
A
A
ft
°F

Applied to the verified AC calculation when PVC is selected. EMT uses a resistance-only screening estimate; this input is not applied there.

Demo assumptions: copper THHN / THWN-2, 90°C ampacity starting column, 86°F base ambient, three current-carrying phases, and no neutral. The 200 A overcurrent-device rating is an illustrative default; confirm it for the actual circuit.

The Table 250.122 base copper EGC is calculated from this rating. No manual EGC size is assumed.

Continue to signup

Live output

Three-phase values recalculate as you edit.

No save required

Raceway fill

35.3%

40% limit · 0.7176 in² of 2.0360 in²

Within selected limit

  • 3 × Phase conductors0.6669 in²
  • 1 × Equipment grounding conductor (6 AWG)0.0507 in²

Equipment grounding conductor

6 AWG copper

200 A device · Table 250.122 base 6 AWG

Modeled minimum phase
2/0 AWG
Selected phase
2/0 AWG
Modeled ampacity check
Selected phase meets the modeled ampacity baseline.
Required EGC area
26,240 cmil
Selected EGC area
26,240 cmil
NEC 250.122(B)
No proportional increase is needed; the EGC remains at or above the Table 250.122 base size.
NFPA 70 (2026) source

Three-phase voltage drop

5.88 V

1.22% of 480 V line-to-line · Resistance-only screening estimate

Derated ampacity

195 A

195 A base × 1.00 ambient × 1.00 conductor factor

Circuit basis

480Y/277V

3 current-carrying conductors · 4 conductors counted for fill

Voltage basis: Resistance-only, unity-power-factor screening estimate using K = 12.9 at 75°C. It does not include inductive reactance, apply the entered power factor, or model EMT/RMC impedance. Use an installation-specific AC impedance calculation for design review. NCCER Electrical Formula Sheet

Ampacity basis: 90°C is the starting column only; its source row is cross-checked to Southwire Installation Guide, NEC Table 310.15(B)(16) (formerly 310.16), reprinted 2017. The 75°C Table 310.16 value for this conductor is 175 A. Terminal, load, and other NEC limits are not evaluated here. NEC Table 310.16 NFPA 2026 code-cycle table Southwire table cross-check

Phase and EGC sizing: This is a modeled minimum using the available copper 90°C starting-column rows and supported correction factors. It is not a final verified conductor selection; check 75°C terminal limits, load rules, and installation conditions. NEC 250.122(A) and 250.122(B)

Fill references: Chapter 9, Table 1 (permitted fill); Table 4 (EMT raceway area); Table 5 (THHN / THWN-2 conductor area). Article 358 (EMT). View NFPA 70 (2026) in NFPA LiNK

Restoring this tab’s saved example inputs…

00 / Project record

Project record

Projects organized in WireWicketLoading project count…

01 / Calculation desk

The checks that shape the install.

Keep useful code context close to the inputs, so a calculation is easier to review and easier to pass along.

01

Raceway fill

Check conductor fill across common raceways, with NEC Chapter 9 references alongside the calculation.

EMT · RMC · PVCOpen calculator
02

Raceway fill batch schedule

Edit a group of conductor and raceway rows, then review each valid result and correction in place.

Multiple rows · row-level validationOpen batch schedule
03

Ampacity derating

Bring ambient-temperature and current-carrying conductor adjustments into the same review.

Temperature · conductor countOpen calculator
04

Voltage drop

Estimate single- or three-phase voltage drop using verified resistance and reactance data where available.

Single + three phase · copper + aluminumOpen calculator
05

Box fill & pull-box sizing

Add NEC 314.16 fill allowances, check box capacity, and size 4 AWG-and-larger pull boxes.

NEC 2026 · project cut sheetsOpen NEC 314 calculator
06

Motor branch-circuit sizing

Use supported NEC motor table rows for full-load current, conductors, branch protection, overloads, and the equipment grounding conductor.

NEC 2026 · raceway handoffOpen calculator
07

Transformer sizing

Calculate winding current, transformer overcurrent limits, and copper conductor and ground sizes with a direct raceway-fill handoff.

NEC 2026 · primary + secondary · raceway handoffOpen calculator
08

Free NEC lookup pages

Get a quick, cited answer for supported code questions, then adjust the inputs in a live raceway-fill calculator.

Derived answers · NEC 2026 sourcesBrowse NEC lookups

02 / From run to record

Keep the project behind the calculation.

Separate calculators are easy to find. A consistent project record and a clean handoff are what help teams stay in sync.

  1. 01

    Save the circuit once

    Create or open a project and keep the circuit inputs, material basis, and route assumptions together.

  2. 02

    Review supported checks

    See supported advisory outputs and explicit unsupported or not-assessed states without a compliance claim.

  3. 03

    Build the material schedule

    Reuse the saved circuit to generate quantities and a known-price material subtotal, with unpriced lines called out.

Reference note

Clear references. A careful final check.

WireWicket helps organize calculation inputs and NEC references. Verify every reference and result against the NEC edition adopted for the job and the project’s requirements.

Read calculation scope and verification examples

Security & Privacy

03 / Start a conversation

Bring your next submittal into focus.

Tell us how your team handles electrical calculations and project documentation.

Email WireWicket

wirewicket-7@polsia.app